The 2-2-3 work schedule: how it works for employees and managers.
Work 7 days in 14, never more than three in a row, and get every other weekend off. Here is the 2-2-3 schedule from both sides of the rota.
A 2-2-3 work schedule is a 14-day rotation where you work 2 days, take 2 off, work 3, take 2 off, work 2 and take 3 off. You work 7 days out of every 14, never more than three in a row, and you get a three-day weekend every other week. It is also called the Panama schedule or the 232 schedule, and it is usually run with 12-hour shifts.
Most articles stop at the 24/7 factory version. This one also looks at what the pattern feels like from the employee’s side, and how restaurant and retail managers can use a smaller version of it to cover a seven-day week.
What is a 2-2-3 work schedule.
The name describes the blocks of working days. Laid out on a Monday to Sunday calendar, one person’s fortnight looks like this:
- Week 1: work Monday and Tuesday, off Wednesday and Thursday, work Friday to Sunday.
- Week 2: off Monday and Tuesday, work Wednesday and Thursday, off Friday to Sunday.
Read it as one long line and you get 2 on, 2 off, 3 on, 2 off, 2 on, 3 off, which adds up to 14 days with 7 working days. Then it starts again.
The same pattern goes by several names. “Panama” usually refers to a four-crew, 12-hour version that covers 24/7, often with crews rotating between days and nights. “Pitman” is frequently used for the version where crews stay on fixed day or night shifts, which we cover in detail in our Pitman schedule guide. The on and off rhythm is the same in all of them.
How it covers a seven-day week.
The clever part is that the pattern has a perfect mirror. When Team A works, Team B is off, and vice versa. Two teams on 2-2-3 give you exactly one team on every day of the week, with no gaps and no doubling up.
| Team | Mon | Tue | Wed | Thu | Fri | Sat | Sun |
|---|---|---|---|---|---|---|---|
| Week 1 | |||||||
| Team A | Work | Work | – | – | Work | Work | Work |
| Team B | – | – | Work | Work | – | – | – |
| Week 2 | |||||||
| Team A | – | – | Work | Work | – | – | – |
| Team B | Work | Work | – | – | Work | Work | Work |
For 24/7 coverage, you double it: two teams on days and two on nights, four crews in total. In the rotating Panama version, the day teams and night teams swap every two or four weeks. In the fixed version, they never swap.

Hours on a 2-2-3 schedule.
Because every person works 7 shifts per 14 days, average weekly hours depend only on shift length:
| Shift length | Hours per 14 days | Average per week | Busy week / quiet week |
|---|---|---|---|
| 12 hours | 84 | 42 | 60 / 24 |
| 11 hours | 77 | 38.5 | 55 / 22 |
| 10 hours | 70 | 35 | 50 / 20 |
| 8 hours | 56 | 28 | 40 / 16 |
The busy week has 5 shifts and the quiet week has 2. That matters for pay. In the US, the Fair Labor Standards Act generally requires overtime for non-exempt employees above 40 hours in a workweek, so a 12-hour 2-2-3 creates 20 overtime hours every other week. Other countries handle it through weekly limits, reference periods and collective agreements, so check what applies to you. Our guide to overtime tracking explains how to stay on top of it.
What it is like for the employee.
Ask people who work it and you tend to hear the same things.
- The good: half the year off work, short stretches of work, every other weekend off as a three-day break, and a calendar that is the same every fortnight. Planning childcare, sport or study gets easier once you have learned the rhythm.
- The hard: the busy week is long, especially with 12-hour shifts. Working Friday to Sunday every other weekend can clash with family life. And 12 hours plus a commute leaves little room for anything else on a working day.
- The adjustment: the pattern looks irregular on a normal calendar. Most people need a cycle or two before they stop checking the app every morning.
What it looks like for a restaurant or retail manager.
Very few restaurants or shops need four crews on 12-hour shifts around the clock. But the two-team version of 2-2-3 solves a real problem: making sure a senior person is on every day the business is open, without anyone working seven days straight.
Restaurant example. A restaurant is open seven days, roughly 11:00 to 22:00. Two shift supervisors each work 11-hour days on the 2-2-3 pattern. That is 77 hours per fortnight each, or 38.5 hours a week on average, and the restaurant always has one supervisor on the floor. Between a 22:00 finish and an 11:00 start there are 13 hours, comfortably above the 11 hours of daily rest that the EU Working Time Directive sets as a minimum. The rest of the team stays on a flexible schedule built around covers, and the supervisor pattern becomes the stable backbone.
Retail example. A store opens 10:00 to 20:00 every day. Two key holders each work 10-hour days on 2-2-3, which comes to 35 hours a week on average. Every opening and closing is covered by someone with keys, alarm codes and cash-up rights.
Two things to watch. First, if supervisors are non-exempt in the US, the 55-hour or 50-hour busy week triggers overtime. Second, the two people are never on together, so handovers need to be written, not verbal. A shared shift note or team chat thread works well.

Pros and cons.
Pros.
- Seven-day coverage with only two people or teams per shift slot.
- Never more than three working days in a row.
- Three-day weekend every other week.
- Fair: everyone works the same share of weekends.
Cons.
- Long shifts, often 10 to 12 hours.
- Overtime cost in the busy week where it is counted weekly.
- Uneven weekly pay if your payroll pays by the week.
- Little flexibility for people who need the same days off every week.
Who uses the 2-2-3 schedule.
Classic users are manufacturing, warehouses and distribution, police and security, hospitals, dispatch centers and utilities: anywhere coverage cannot stop. In hospitality and retail, it shows up in hotels (reception, night audit, maintenance), 24-hour convenience stores, and as the two-person supervisor or key holder pattern described above. If you are weighing it against other options, see the overview of shift systems, the 4 on 4 off pattern and the DuPont schedule.
How to implement a 2-2-3 schedule.
- Define the slots. Which roles need someone every single day, and for how many hours?
- Pick shift length. Use the table above to land on the weekly average you want.
- Pair people or crews with matching skills so the business runs the same on Team A’s days as on Team B’s.
- Check the rules. Daily rest, maximum shift length, breaks and overtime vary by country, state and collective agreement.
- Agree a cover policy for sickness and vacation before the first gap appears.
- Publish several cycles ahead so people can see the pattern, not just next week.
Common mistakes.
- Building a 2-2-3 for one role and forgetting the rest of the team still needs a demand-based schedule.
- Starting the pattern without checking which team gets the first busy weekend.
- Letting swaps break the pattern so someone ends up with five days in a row.
- Budgeting on the 42-hour average and missing the overtime in busy weeks.
Frequently asked questions.
Is the 2-2-3 schedule the same as the Panama schedule?
Yes, the on and off pattern is the same. “Panama” usually refers to the four-crew, 12-hour, 24/7 version, often with crews rotating between days and nights.
How many days a year do you work on a 2-2-3 schedule?
About 182 to 183 days: 7 out of every 14, before vacation.
What is a 232 work schedule?
Another name for the same pattern, sometimes written to start from a different day in the cycle.
Can a 2-2-3 schedule work with 8-hour shifts?
Yes. It gives 28 hours a week on average, which can suit part-time roles or a pair of employees sharing one full-time position.
Is a 2-2-3 schedule a rotating schedule?
The days off rotate through the week. Whether shifts rotate between day and night depends on the version. See what are rotating shifts.
Patterns like 2-2-3 are easy to draw once and painful to maintain by hand. With Workfeed’s scheduling, you set up the rotating schedule once, roll it forward for as many weeks as you want, and build the rest of the team’s shifts around it.
About these resourcesFree templates, shift schedule guides and explainers from Workfeed, the scheduling, time tracking and team communication software for frontline teams, used by more than 2,000 businesses.
Shift schedules
More shift schedule guides.

24/7 shift schedules: how to staff around the clock.
168 hours a week, every week. Here is the maths behind round-the-clock staffing and a side-by-side comparison of the five most common…
Read the guide
4 on 3 off schedule: how it works and what it costs.
Four days on, three days off, every week. Here is how the 4x10 and 12-hour versions work, how to keep seven-day coverage,…
Read the guide
4 on 4 off shift pattern: the complete guide.
Four 12-hour shifts, four days off, four crews. Here is how the 8-day cycle covers 24/7, what it means for weekly hours…
Read the guide
Continental shift pattern: how the 4-crew rota works.
Four crews, fast forward rotation and a 42-hour average week. Here is the full 28-day continental rota, the 12-hour variant and how…
Read the guide